Skip to content
Free estimates · Fully insured · Hardwood, vinyl plank & laminateCall or text 603-674-9654
603-674-9654Free estimate

Hardwood Floor Installation

We install solid and engineered hardwood in new homes, additions, and remodels. That covers tear-out of the old floor, subfloor prep, and the install.

What's included

  • Removal and disposal of carpet or old flooring
  • Vacuuming, cleaning, and preparing the subfloor
  • Solid or engineered hardwood, in hard or soft woods
  • Standard straight-lay or decorative layouts
  • Your choice of our materials, or the flooring you supply
  • Site-finished or prefinished boards
  • Thresholds and transitions fitted cleanly
  • Baseboards and shoe molding put back when the floor is in
  • Follow-up cleaning when the floor is done

Solid or engineered?

Solid hardwood is one piece of wood all the way through, so it can be sanded and refinished many times over its life. It's the classic choice for living rooms, bedrooms, and halls on above-grade floors.

Engineered hardwood is a real wood top layer bonded to a stable core. It moves less with humidity, which makes it a good fit over concrete, in basements and in rooms where seasonal swings would make solid boards cup or gap. We'll tell you which one suits each room.

Site-finished or prefinished?

Site-finished floors are installed raw, then sanded and finished in place. The surface comes out flat and sealed edge to edge, and you can pick any stain and sheen.

Prefinished boards arrive with the finish already on, so the house is livable sooner and there's no finishing smell. We install both and can walk you through the trade-offs for your home.

What we check before we install

Most floor problems start under the floor. Before we install, we check the subfloor for flatness and squeaks and measure moisture in both the subfloor and the new wood. We let the flooring acclimate when it needs to. It takes a little longer, and it's why our floors stay tight.

Questions

Hardwood floor installation: common questions.

How long does a hardwood installation take?

A typical room or two takes a few days, and a full first floor usually takes about a week. Site-finished floors add time for sanding and three coats of finish. We give you the schedule with the estimate and keep to it.

Can I supply my own flooring?

Yes. You can choose from our materials or buy your own. If you're buying your own, send us the product name and we'll confirm it suits the room before you order.

Can you install hardwood over concrete?

We usually recommend engineered hardwood or click vinyl plank over concrete and in basements, because solid hardwood doesn't handle slab moisture well. We'll test and advise on the right product.

Free estimate

Tell us about your floor.

Send a few details and we'll reach out to set up a visit. Contractors can send plans and a start date for a bid.

Call or text603-674-9654
Based inLitchfield, NH 03052
I am a

Free, with no obligation. The price we quote is the price you pay.